CONCRETE CALCULATOR

Concrete Calculator Brought to you by OZINGA BROS., INC.
    |  
  Home > Irmca Topics > Flowable Fill  
 

 Flowable Fill 

Tired of the bumps in the road that appear after the road is cut to repair utilities?  Ask your local officials about Flowable Fill.

Flowable Fill is a cost effective alternative to the conventional method of replacing material under the roadway after utilities have been installed, or repaired.  Often, the crews dump stone, sand, or other material into the trench and then compact it with equipment.  This method can lead to damaged pipes in the trench, and cannot provide 100% compaction.  Less than 100% compaction means that settlement will occur.  Settlement leads to dips in the road that not only cause damage to cars, and discomfort to those riding in them, but it also requires the crews to come back and re-install material over the settled surface.

Flowable Fill is less expensive and a good Asset Management Tool for local street and highway officials.

When street and highway crews use Flowable Fill to replace the material under the street surface after a utility repair, the Flowable Fill provides 100% compaction, and allows zero settlement.  No dips in the road, no damaged vehicles, no coffee spilled in your lap when you cross the repaired section of road.  The repaired section of road will often be unnoticed to the public.  The road is smoother, and there is not a need for the road crew to return and re-repair the road!

     

·    August 22, 2008
IRMCA Tech Ed Meeting 1:30 pm
IRMCA Pyramids Office
Indianapolis, IN

·    September 4, 2008
IRMCA/NRMCA Pervious Certification
South Bend - St. Joe's County Fairgrounds

·    September 9, 2008
IRMCA/NRMCA Pervious Certification
Indianapolis - Indiana State Fairgrounds
Normandy Barn

 ·    September 16, 2008
IRMCA/NRMCA Pervious Certification
Jameson Inn, Green River Rd
Evansville, IN

·    September 18, 2008
IRMCA, IN-ACPA Golf Outing
Purgatory Golf Club
Noblesville, IN

·    September 22-24, 2008
NRMCA CCSP II: Customer Business Knowledge
Embassy Suites North, Hosted by IRMCA
*For Staff that works with Contractors!
Indianapolis, IN

·    October 29, 2008
CICG Committee Meeting
Pyramids office, 9:00 a.m.
Indianapolis, IN

·    January 11-13, 2009
IRMCA Short Course
Marriott East Indianapolis
Indianapolis, IN

·    January 26-28, 2009
IN-ACPA PCCP Workshop
Marriott East Indianapolis
Indianapolis, IN

·    April 13-15, 2009
IRMCA/NRMCA CCSP III Sales Training
Embassy Suites North
Indianapolis, IN

 
 
home  |  organization  |  calendar  |  membership  |  projects  |  irmca topics  |  homeowners  |  industry members  |  community projects  |  press room  |  awards  |  brochures  |  certified pervious installers  |  links  |  contact us  | 
Search Engine Optimization and Web Site Design © Copyright 2004-2005 Indiana Ready Mixed Concrete Association. All Rights Reserved