CONCRETE CALCULATOR

Concrete Calculator Brought to you by OZINGA BROS., INC.
    |  
  Home > Projects > Endress + Hauser Flowtec

2007 Outstanding Concrete Awards
Project:

Endress + Hauser Flowtec AG

   

OUTSTANDING CONCRETE ACHIEVEMENT AWARD
Presented to Endress + Hauser Flowtec AG in Greenwood

The Indiana Ready Mixed Concrete Association (IRMCA) presented the 2007 Outstanding Concrete Achievement Awards for projects in the State of Indiana on December 11, 2007 at the Indianapolis East Marriott.

In the category of Concrete Commercial & Industrial Projects: Commercial Building Projects, the winner was the Endress + Hauser Flowtec AG located in Greenwood.

The project team is the owner/developer: Endress + Hauser Flowtec AG, the Engineering and Architectural firms: Force Design, Inc., the General Contractor and Concrete Finisher: Force Construction Co., Inc., and the ready mix producer: Shelby Materials.

The design and construction of the facility involved high levels of construction and manufacturing technology. Concrete materials included in the project were a two—foot thick structural basement slab for the testing lab and reservoir area. Structural walls for the reservoir utilized a concrete mixture incorporating integral Xypex waterproofing. A two-foot thick structural slab above the basement and reservoir areas connected with the at-grade slab of the 60,000 square foot office and manufacturing facility. This slab was designed with a 50 percent Portland cement – 50 percent ground blast furnace slag blend along with synthetic fiber reinforcing. Combined with the UltraCure single wet curing blankets, shrinking and cracking were virtually eliminated. A perimeter concrete wainscot wall for the plant area utilized special formwork by eliminating visible form joints and wall ties, providing a very smooth wall surface with architectural rustication joints. Architectural concrete panels utilized on the office area were pre-cast on site, including structural steel embeds. The panels were removed from their casting beds on a tightly time-controlled basis. Special care was taken to use limestone aggregate for consistent color and to minimize the chance of “pop-outs”. A total of 4,970 cubic yards was used in this project.

IRMCA presents these awards to recognize extensive application or imaginative use of concrete; and to honor the accomplishments of project owners, architects, engineers, contractors, owners and ready mixed concrete producers.

 
 

BACK TO PROJECTS
     

·    January 11-13, 2009
IRMCA Short Course
Marriott East Indianapolis
Indianapolis, IN

·    January 26-28, 2009
IN-ACPA PCCP Workshop
Marriott East Indianapolis
Indianapolis, IN

·    April 13-15, 2009
IRMCA/NRMCA CCSP III Sales Training
Embassy Suites North
Indianapolis, IN

 
 
home  |  organization  |  calendar  |  membership  |  projects  |  irmca topics  |  homeowners  |  industry members  |  community projects  |  press room  |  awards  |  brochures  |  certified pervious installers  |  links  |  contact us  | 
Search Engine Optimization and Web Site Design © Copyright 2004-2005 Indiana Ready Mixed Concrete Association. All Rights Reserved