Plastic shrinkage cracking in concrete is one of the earliest and most preventable forms of surface distress. It occurs when water evaporates too quickly from freshly placed concrete before the material has gained sufficient tensile strength. These cracks typically appear within the first few hours after placement and often form a random, shallow pattern that resembles a spiderweb; across large, exposed surfaces such as slabs, pavements, or bridge decks.
Although they may seem superficial, plastic shrinkage cracks can open pathways for moisture, chlorides, and other harmful agents, leading to long-term durability issues. Understanding the science behind this issue is key to preventing it.
Plastic shrinkage cracking results from an imbalance between the rate of water evaporation from the concrete surface and the rate of bleeding (water rising to the surface). When evaporation exceeds bleeding, surface tension increases; pulling the concrete apart before it hardens.
Several conditions increase this risk:
Once evaporation surpasses 0.2 lb/ft²/hr (≈1 kg/m²/hr), the risk of plastic shrinkage cracking rises significantly, especially when concrete is not cured promptly or is not adequately protected.
Proper curing concrete practices are essential to minimize plastic shrinkage. Curing ensures that moisture and temperature are maintained during the critical early stages of hydration, allowing the concrete to develop its designed strength and durability.
Effective curing techniques include:
Each method depends on the project’s scale and environmental conditions, but the goal remains constant, to slow down evaporation and support hydration.
The concrete mix design plays a major role in reducing the likelihood of plastic shrinkage cracking. Mixes with excessive water content, high cementitious materials, or poorly graded aggregates are more susceptible to cracking.
Best practices include:
Partnering with a knowledgeable ready mix supplier can help tailor the mix to environmental conditions and project needs; reducing risk before the first batch arrives on site.
Plastic shrinkage cracking is especially sensitive to environmental exposure. Conditions such as hot, dry, or windy weather accelerate evaporation. Contractors can reduce risk by:
Even in moderate conditions, awareness of evaporation rates can mean the difference between a flawless slab and a cracked surface.
Preventing concrete plastic shrinkage cracks requires coordination among contractors, finishers, and ready mix providers. Key construction best practices include:
A proactive approach during placement and finishing ensures consistency across projects and reduces the likelihood of early-age distress.
While control joints in concrete primarily address drying shrinkage cracking, they also play a role in overall crack management. Properly designed and spaced joints help relieve internal stress and help guide cracking to predetermined, less visible locations.
Best practices:
Combining good joint work with preventive curing helps maintain both structural and visual integrity.
Timing is everything. The first few hours after placement determine whether plastic shrinkage cracks will form. Start curing immediately after finishing operations or as soon as surface sheen disappears.
If conditions are particularly harsh, begin fogging before finishing to keep the surface cool and moist. The earlier the curing process begins, the greater the chance of preventing cracking.
The most effective prevention strategy against plastic shrinkage cracking in concrete is minimizing water loss. In addition to proper curing and mix design, practical site strategies include:
Small steps at this stage prevent significant repair costs later.
While plastic shrinkage cracks are typically shallow, they can compromise the durability and longevity of concrete. Cracks allow moisture to ingress, leading to potential corrosion of embedded steel, surface scaling, or aesthetic concerns.
Over time, minor surface cracks may expand or act as initiation points for other forms of cracking, especially under freeze-thaw cycles or heavy traffic.
Repairing plastic shrinkage cracks depends on their severity and visibility. Options include:
However, prevention remains the most effective, and cost-efficient strategy.
Plastic shrinkage cracking is an avoidable challenge that stems from the earliest stages of concrete placement. Through the right combination of concrete mix design, curing methods, and construction best practices, the risk can be drastically reduced.
Understanding how to balance evaporation, control water loss, and manage curing will help contractors, engineers, and owners protect both performance and appearance.
As climate patterns shift toward hotter and drier conditions, curing concrete and managing moisture loss will become even more critical. Emerging technologies such as real-time sensors, intelligent admixtures, and low-shrinkage cements will help reduce the risk further.
Preventing plastic shrinkage cracking is both a science and a craft. Both in Indiana and across the country, it starts with well-informed professionals and best-in-class materials.
Connect with trusted experts across Indiana through our IRMCA Member Directory and find the right ready mixed concrete professionals to support your success.